Gallery

Project of the Month

Winners

Quick Contact

August Project of the Month 2018

 
Smoking-Shelter

August’s Project of the Month goes to this series of prefabricated shelters from our welded steel line of products.  The shelters have a painted finish using a prime to paint system with a urethane finish.  Entirely manufactured in our facilities, the shelters were shipped to their job-site and easily anchored into the ground, saving the customer site downtime compared to stick-built.  The project includes single man monitoring shelters as well as multiperson waiting areas.  Since Panel Built’s shelters are manufactured to our customers’ specifications, each structure is perfectly designed to meet their specific needs.  Additionally, the shelters are fully relocatable and able to be moved at a later date if necessary. 

 Prefabricated-Shelter