Project Picture of the Month - April 2013

 
618

April’s Winner

26′ x 29′ Tall Wall Equipment Enclosure

This month’s winner is a Value Core in-plant office system with 14′ tall walls to accommodate sensitive equipment being held inside. The enclosure includes a high-speed roll-up door to allow supplies in and out with a forklift as well as double-rail barrier rail to protect the building.

490

In order to satisfy the climate control needs of the equipment housed inside, this unit was sold with a 3 Ton ATEX HVAC complete with duct work and programmable wall control. Installed by a Panel Built installation crew, this entire project went from purchase order to sign off in only 55 days, with the install accounting for about 10 days.

Thanks to Bart Beise for getting us these pictures! He will receive a $25 gift card for his efforts. If you have some great pictures of a recent Panel Built install send them in for your chance to win!