Project Picture of the Month - May 2015 City Scrap
20 x 37 Custom Exterior Building
The May Project of the Month winner includes a 20′ x 37′ and a 28′ x 37′ custom-engineered exterior building, as well as two three-wall bump outs – all of which are used to enclose a conveyor line and the associated equipment. This building keeps the conveyor line, and all of its electrical components safe from the weather in the unforgiving Great Lakes area. Custom designed to match up with existing stair systems, conveyor lines, and platforms – this building features 18′ tall insulated steel panel walls and a panelized gable roof. Even with all of the custom cuts and difficult job site, this install was completed by a Panel Built crew in approximately two weeks.