Gallery
Project of the Month
Winners
Quick Contact
May Project of the Month 2017
May’s Project of the Month goes to this 5’ 6” x 9’ 6” stainless steel control booth. This unique welded steel building offers a unique design compared to our traditional welded steel line. With this control booth to be set in California, as a part of a brand new maintenance and operations facility set near the coast.
The pre-assembled building comes equipped with HVAC, electrical, a 360-degree view, two counter tops, sliding glass windows, and a steel base. Overall, we are very pleased with the design and turnout of the structure. Congratulations to all who worked to complete this fantastic, sleek control booth.